Posts by Leigh Powell
5/3/25
Wednesday – Status Amber starting off the 10th. Frosty…. but looking like the last one, so we can get some Mowing done before play tomorrow onwards π€ Fresh Pin Position’s, Overflow progress yesterday wasn’t the best…. going from a Closed Area to crack on, to opening the area and being full of cars and abandoning…
Read More4/3/25
Tuesday – Status Red. Frosty Setup today, Overflow car park continues, Grass Overflow getting some drainage works started now its drier Lots of coned off area’s in the Car Park, in preparation for Artic Lorries with materials arriving. These vehicles need space to turn in, around and out… so while deliveries are arriving over the…
Read More3/3/25
Monday – Status Red. Fresh morning… but a belter! Machinery checked over for fluids and given a run up while weather chilly Overlow Works progressing well and draining a chunk of the Labour Green’s gagging for a trimm, with the different grasses growing at different rates. Zero opportunities recently with crazy rain, now frozen mornings…
Read More2/3/25
Sunday – Status Red. -3 Degree’s this morning but with some higher temperatures late morning. Frosty Setup this morning with a Divot of yesterday’s play & Bunkers Scratched where possible, Fresh pin position’s, Little yellow things collected later on after setup π Cracker of a day!
Read More1/3/25
Saturday – Status Red, Frost & Fog Delay eeeeekkkk πΆβπ«οΈπ¬ Frosty Setup with Tee Setup & Bunkers Raked where possible.
Read More28/2/25
Friday – Status Red with a strong tinge of white! π₯Ά 10th Tee Start in place still while the remaining surface water on the Front drains away. Fresh Pin Position’s, Daily Setup Tasks, Overflow Car Park draining quite a lot of Labour at the moment. Sub base in final stages, ready for topping next week…
Read More27/2/25
Thursday – Status “All Carry” continuing Starting off the 10th, as more surface water remains on the Front 9. Practice Ground Closed 12 till 2 for Maintenance. Greens Dew renoval + Water pushing where needed. Daily tasks of Divoting & a scratch of the traps, Overflow Car Park remains Closed
Read More26/2/25
Wednesday – Status “All Carry” off the 10th. Frosty surfaces first thing…. then bucket loads of rain due mid morning π¬ Fresh Pin Position’s, Daily setup tasks, Organic Fertiliser applied to areas that need some help, Overflow Car Park Closed in preparation for Material deliveries and a tidy up!
Read More25/2/25
Tuesday – Status “All Carry” off the 10th. Not the most positive start to 2025 with above average rainfall… by a fair bit with more days to go in Feb πΆβπ«οΈ Daily Setup Tasks, Ditches Brush Cut, Overflow Car Park work ongoing…. with the area being Closed Wednesday to Friday this week, Everyone’s favourite…. Ball…
Read More24/2/25
Monday – Status “All Carry” off the 10th today. Enjoy the walk those who are braving it! Naff old night with some pretty heavy rainfall over the last few days. Surface water around mainly on the Front 9…. but nothing that won’t clear up when it stops raining. Daily setup tasks completed, Some work started…
Read More