1/5/25

Thursday – Status Green. Course behaving well, considering only a smidge of rain over the last 60 days! 🥵 Green’s nipped with no brush or VL. Fresh Pin Position’s. Spot treating Weeds as they start to pop up. Ditches Strimmed. Tee Banks Mown. Worst Tee’s getting another pull of cores. Old Hydraulic leak lines on…

Read More

30/4/25

Wednesday – Status Green for the Baxter Trophy 🏆 Greens trimmed with VL. Approaches nipped With growth still at a high, a cheeky dress on the greens to level out some imperfections. A matt behind… Then a splash of H2O. Bunker TLC….. in the form of a Flymo, Strimm, blow and a rake. Tee’s having…

Read More

29/4/25

Tuesday – Status Green, 10th Tee Start. Greens trimmed, Fairway’s cut, 1st Cut of Semi & Runways topped, Daily Tasks, Front 9 area’s on Tees cored along with some Collars on back 9 and then front 9 too! Tee’s getting a dry cut later on

Read More

28/4/25

Monday – Status Green. Scorcher of a forecast this week 🥵 Greens mown with No VL as this area is getting a lot of traffic already… Green’s Sprayed with some Fe, several forms of N, MOP, MAP, Mg, Mn, Zn, PGR input increasing now surfaces have recovered from Maintenance & some Wetter. Soil Transportation to…

Read More

27/4/25

Sunday- Status Green. Daily setup tasks completed this morning. Greens cut, Pin positions moved, Tee set and a divot, Bunkers raked.

Read More

26/4/25

Saturday – Status Green. Course setup greens cut, Approaches cut, After Thursday mechanical issues the sprayer is now fixed. So the last remaining fairways sprayed.

Read More

25/4/25

Friday – Status Green…. a “Bums on Seats” kinda morning 😆 Greens trimmed, Fresh Pin Position’s, Fairway’s cut, Tee’s mown, 1st Cut topped, 2nd Cut topped also, Tee Banks aswell, Daily Setup tasks. Yesterday’s Fairway Spray abandoned due to a blown up Sprayer Pump… 😔. Pump removed this morning, ready to be whizzed to be…

Read More

24/4/25

Thursday – Status Green. Practice Ground Closed 12-2 for Maintenance. Greens nipped with no VL. Approaches cut 2nd day on the bounce so we can leave tomorrow due to lots of “Friday things” going on 💪 Looking a smidge hungry now with a Base feed on them soon 😋 Fairway’s Sprayed with some Fe, few…

Read More

23/4/25

Wednesday – Status Green. No operation to Greens this Morning, after a welcomed splash of rain 😙 Strange to see puddles after soooo long though 🤔 Approaches nipped. Fresh pin position’s. Daily setup tasks. 4th Banking started up again now labour is available after various things draining bodies. Machinery Servicing. Some tree work beside the…

Read More

22/4/25

Tuesday – Status Green. Greens cut, quite a few on the bounce now as growth is high and clippings higher than wanted. Tee’s trimmed, Fairway’s cut, Cut Rough Weed Spray started, Daily Setup Task’s, Pot Hole on the Driveway prepped…. Signage outside getting a Baby Wipe 👶 Council get emotional and touchy if we do…

Read More