Posts by Leigh Powell
5/3/26
Thursday – Status Amber. 10th Tee Start with the 1st Green on Temp & 7th Markers on the Fairway. Greens trimmed. Tee’s mown…. larger Tee’s Ride on mown & smaller Tee’s Hand mown. Bunker on 7th getting some Turf. Tree planting ongoing….. Reed Clearance to the 1st Pond continues.
Read More4/3/26
Wednesday – Status Amber, 7th Tee on Temporary Tee & 1st Green on Temporary mid morning onwards due to Pond Clearance. Irrigation system being primed up ready for Season… expect some rougue sprinklers to pop up 😬 Green’s rolled. Fresh Pin Position’s. Fairway’s mown. Semi cut on even holes following yesterday’s odd holes being cut.…
Read More3/3/26
Tuesday – Status Red, 7th Green on Temporary. Green’s nipped without VL. Approaches trimmed. Daily Setup Tasks. 1st Cut of semi cut on odd number holes 4 bands instead of 2 for now…. Even holes tomorrow to avoid getting in the way of Golf and cutting up golf balls! Sand bags made for the Bunker…
Read More2/3/26
Monday – Status Red, 7th Green on Temporary. Green’s Rolled. Daily Setup Tasks. Gravel Banding works, now the Course can accept heavy machinery. Boards back out ready for Access to the Bunker works on 7th. Drainage work to the Bunker. Soil shaping. Material transportation.
Read More1/3/2026
Sunday – Course Status red Starting with Greens getting a roll Tee set up bunkers raked And of course range pick after
Read More28/2/2026
Saturday – Course Status red Starting with the course getting a set up 18th Green right handside bunker having the inside shaped before filling with lovely sand 🤩 Then of course range picked after morning jobs
Read More27/2/26
Friday – Status Red, 10th Tee Start with the 7th Green on Temporary due to Bunker Works. Fresh Pin Position’s. Daily Tasks. 18th Bunkers getting some sand in them to protect the exposed soil faces from damage. 7th Fairway Bunker works ongoing. Gravel Banding to the 2nd approach later on.
Read More26/2/26
Thursday – Status Red, starting off the 10th. Practice Ground Closed 12-2 for Maintenance. Greens rolled. Tee’s mown. Fairway’s mown. Daily tasks knocked out. Ball washers topped up. 7th Bunker works ongoing.
Read More25/2/26
Wednesday – Status Red, 7th Markers on Fwy Green’s trimmed. Application of some Dew Suppressant behind to keep the plant drier through the night into the mornings. Approaches nipped. Small and newly built Tee’s Hand Mown, with the rest done tomorrow with a ride on. Daily Setup Tasks. A quick play around some on site…
Read More24/2/26
Tuesday – Status Red. Green’s Rolled. Planned application of some Nutrition, PGR & Wetter to the Greens. Fresh Pin Position’s. Daily tasks. 7th Bunker work continues. Last remaining in house built Tee Post installed.
Read More