20/3/26

Friday – Status Green, Back 9 Open with the Front 9 Closed. White Status for now 🥶

Delay to planned work while the frost is around… but when we can, we will be doing the following.

Ball Collection.

Pin position’s moved. Colour’s of the Flags DO NOT represent their position on some of the Greens. This is in preparation for tomorrow’s Cross Country event. Use them Rangefinder Scopes 😁

Weed spraying in areas.

Ball washer top up.

Remaining Blue Bell bulbs planted. 2000 have gone out the last few days.

Daily tasks.

Tee Banks mown.

1st Cut of Semi on Front 9 topped.

Fairway’s roped to remove dew.

Then when drier, Fairway’s mown. Very pleased with how these have come out of the winter after some heavy play and 1 day of closure 💪

Fairway’s Sprayed with some N, Mg, Fe, PGR (on a select few) along with some Wetter. This is to knock back the Moss and encourage the grass to start to thickening out and gain better coverage.

Approaches trimmed with no boxes with brush down. This is to reduce to risk of collecting any granular fertiliser that was applied to the Greens and collars Wednesday.

Tee’s cut.

Tee’s dressed.

A dry roll to the Front 9 Greens.

Disappointing to see some whopper pitch marks on the Greens. Please repair your’s and another then there would be zero!