6/11/25
Thursday – Status Green, Practice Ground Closed 12-2 for Maintenance.

Green’s leaf clearance and a trimm of the hole as drizzly.
Daily setup.


2nd Bunker works continue.


Tree limb lifting.

More Post & rope out.

Ball washer fluids swapped.
Thursday – Status Green, Practice Ground Closed 12-2 for Maintenance.

Green’s leaf clearance and a trimm of the hole as drizzly.
Daily setup.


2nd Bunker works continue.


Tree limb lifting.

More Post & rope out.

Ball washer fluids swapped.