12/8/25

Tuesday – Day 2 of Maintenance Week.

Back 9 Open for play with Front 9 Closed for Maintenance.

Front 9 getting a copy and paste of the Back 9 yesterday 💪 Sooooo the pics will mainly be the same 😆

Green’s cut,

Greens double Verti-Cut and boxed off,

Debris remaining blown,

3 passes of the dresser in gear Low 2, Gate max, belt & spinners @ 100%.

Wiedermann over the top with 12mm tines to 9 inches at 2 inch centres,

Pro Core over the top with 12mm tines to 5 inches at 1.5 inch centres,

Wait for the 🌞 to do its work and dry the RH37 sand so it falls to the bottom of the various spiker holes when swept.

Heavy spots of sand blown,

Roller over the top to consolidate the surface,

Collapsed hole moved ready for play tomorrow 💪

Tees and Approaches trimmed on the Front 9,

Tee’s & Fairways Cored on the Front 9,

Core’s swept up and piled up ready for collection when labour permits.